INTERACTIVE TOOL
Model your datacenter’s power economics in seconds.
Plug in your load, PUE, lease rate and capex to see how the numbers stack up. Built on the same assumptions behind our 2026 trend report.
Scroll to use
RUN THE NUMBERS
Your inputs. Live economics.
Your assumptions
Start simple — open advanced for the full modelSize & power
Revenue & build cost
Returns & economics
All-in capex $/kW ⓘ
$10.0k
$1.0B total
Yield on cost ⓘ
6.5%
unlevered
Cash-on-cash ⓘ
5.7%
levered
Power draw
130 MW
Energy / yr
968 GWh
Power bill / yr
$79M
Revenue / yr
$180M
EBITDA / yr
$65M
Where each rent dollar goes
Per kW-monthThe cost of waiting
Existing asset payback
~17.5 yrs
Traditional route payback
~21.5 yrs
Cost of waiting for power the traditional way
$245M
over the extra 45 months before power comes online
Compatible power assets
Matched to your ~130 MW drawFast-start, common in existing peaker fleets
2 × ~72 MW
to cover your load · $347–489/kW
e.g. LM6000PF+, FT8 SP60, FT4000 SP70
Workhorse peakers, widely available secondhand
2 × ~88 MW
to cover your load · $324–416/kW
e.g. 6B.03, SGT-800, 7E.03
Efficient, mid-merit generation
1 × ~260 MW
to cover your load · $237–245/kW
e.g. 7F.05, SGT6-5000F, M501GAC
Newest and most efficient, rarely available used
1 × ~430 MW
to cover your load · $198–214/kW
e.g. SGT6-8000H, 7HA.02, 7HA.03
Unit sizes, frequency and $/kW from the EMBR turbine reference (Gas Turbine World 2025). Existing peaker fleets skew toward aeroderivative and E-class machines — plan N+1 for redundancy.
Illustrative model built on typical industry ranges. Figures are for education only — not a quote, an offer, or investment advice.
Source power faster
Ready to bring power online years ahead of the queue?
Talk to EMBR about matching your load to existing turbine assets and sourcing power on an accelerated timeline.
WHY IT MATTERS
Decisions worth millions shouldn’t rest on a spreadsheet guess.
Real power assumptions
Load, PUE and utilization modeled the way operators actually build — not idealized nameplate figures.
Lease vs. capex clarity
See the crossover between leasing capacity and building your own, priced per kW in seconds.
Answers before the meeting
Pressure-test a site’s economics instantly, then bring us in to turn the model into delivered megawatts.
FROM MODEL TO MEGAWATTS
Like what the numbers say? Let’s build it.
We deliver turnkey power capacity in 12–24 months. Bring us your model and we’ll turn it into online megawatts.